Soccer Field and Track
During the summer of 2005, the soccer field was replaced by a regulation-size soccer field, constructed using synthetic turf. Synthetic turf, which has become standard on high-end fields, is significantly more durable than grass, and has excellent performance and safety characteristics.
Surrounding the soccer field, an eight-lane track was added. New lighting was also installed to enable evening use of the field and track.