| Building (see color key) |
Replacement Value | Critical Deficiencies | Potentially Critical | Necessary Long Term | Upgrades & Aesthetic | Grandfathered Codes | Sum of Categories | FCI(3) | Sum of Categories | FCI(5) | ||
| 1 | 2 | 3 | 4 | 5 | 1-3 | 1-3 | 1-5 | 1-5 | ||||
| SITE | $18,518,000 | $2,617 | $1,050 | $1,854,275 | $1,492,779 | $6,895,823 | $1,857,942 | 0.1003 | $10,246,544 | 0.5533 | ||
| FCI is defined as the cost of the reparations divided by the replacement value of the building. | ||||||||||||
| RED = POOR CONDITION (FCI is higher than 0.2000) | ||||||||||||
| YELLOW = FAIR CONDITION (FCI is between 0.1000 and 0.2000) | ||||||||||||
| GREY = GOOD CONDITION (FCI is lower than 0.1000) | ||||||||||||
Last Updated on 12/20/00