Sarah Sze: Blue Wall Moulting
Past
September 11, 2016 - June 11, 2017
Foster Stairwell
Blue Wall Moulting traces the structural elements behind the wall of the Foster Stairwell. Created with a basic chalk snap-line technique, which mimics the process used in building construction, the drawing follows the hidden architecture of the space, drawing attention both to the surface and to what lies behind.